Before take-off
- Architectural elevations and door schedule
- Ceiling and flooring finish schedule (affects track and channel selection)
- Acoustic performance target for partitions, if specified
- Fire-rating requirements for any assembly
- Site access, loading, hoist and after-hours restrictions
Documents we supply
- Itemized quote with per-assembly pricing
- Shop drawings for approval before fabrication
- Certificate of insurance ($5M CGL) and WSIB clearance
- Product data and safety-glazing certification
- Warranty documentation at close-out
Scheduling reality
Glass is measured from the built condition, so partitions cannot be templated until track substrate, flooring and ceiling are complete. Building that two-to-three-week fabrication window into the schedule after finishes — rather than in parallel — is the single biggest driver of on-time glazing.
Single-mobilization strategy
Where the schedule is tight we can template in phases and install in one pass, provided each phase's finished conditions are locked. We will map that sequence with you at the pre-construction meeting.